Town rules / Matteson
Matteson contractor license & registration requirements
What a contractor needs to register with Matteson, Illinois — fee, bond, insurance, credentials, term and how to submit — compiled from the village's own published sources.
Cook County, IllinoisVerified from official sourceExpires: Rolling (1 yr from issue)Last verified Sep 25, 2026
Renewal checklist
- 1Completed application formUse the link in the sidebar.
- 2Registration fee — $150 ("The annual license fee is $150. The license expires one (1) year from the day of issuance.")
- 3License & permit bond — $10,000 original License and Permit Bond; bond must specify exact contractor type (e.g., "General/Roofing"). General contractor bond covers all trades except roofing, electrical, plumbing, fire alarm and fire sprinkler.Obligee: Village of Matteson as obligee
- 4Certificate of insuranceBodily Injury Liability $500,000.00; Property Damage Liability $300,000.00; or Combined Single Limit $800,000.00 — certificate naming Village of Matteson as certificate holder
- 5Workers' compensationconfirm by phonenot published
- 6Trade credentialsOriginal bond (not copy) specifying contractor type; certificate of insurance naming Village as holder. Requirements PDF does not list state-license copies or electrical test requirement explicitly.
- 7Submit: Online portalOnline via Citizenserve: "Applying for Contractor License and Registration, Building Permits ... will now be completed utilizing this new software" (documents uploaded and payments made online)Portal: Citizenserve
Term & renewal
- License term (as published)
- "one (1) year from the day of issuance"
- Expiry model
- Rolling — one year from your issue date. Every contractor has a different deadline.
- Renewal window / late fees
- not published ("Registrations must be renewed annually")
Fees, bond & insurance (as published)
- General contractor fee
- $150 ("The annual license fee is $150. The license expires one (1) year from the day of issuance.")
- Subcontractor / trade fee
- $150 (single annual fee applies to all listed trades; no separate subcontractor fee published). Fee does not apply to State of Illinois licensed plumbers, sprinkler contractors, or fire alarm/fire sprinkler contractors.
- Other fees & penalties
- not published
- Bond
- $10,000 original License and Permit Bond; bond must specify exact contractor type (e.g., "General/Roofing"). General contractor bond covers all trades except roofing, electrical, plumbing, fire alarm and fire sprinkler.
- Bond payee / obligee
- Village of Matteson as obligee
- Liability insurance minimum
- Bodily Injury Liability $500,000.00; Property Damage Liability $300,000.00; or Combined Single Limit $800,000.00 — certificate naming Village of Matteson as certificate holder
- Workers' compensation
- not published
- Other requirements
- Original bond (not copy) specifying contractor type; certificate of insurance naming Village as holder. Requirements PDF does not list state-license copies or electrical test requirement explicitly.
- Trades covered
- "All contractors and subcontractors performing work within the Village must be registered." Licensing requirements PDF lists ~30 trades: carpentry, demolition, excavating, electrical, insulating, masonry, paving, roofing, sewer, cement/concrete, drywall, glazing, HVAC, landscaping, painting, plumbing, sheet metal, tuckpointing, asphalt, board-up, remodeling, siding, solar panel installation, tree removal, deck, elevator, chimney, fence, fire sprinkler/alarm, garage door, floor covering, lawn sprinkler, sign, windows/doors.
Notes
Requirements document very recently updated (5/28/2026). Swiftbonds (third-party, secondary hint only) also lists a $10,000 Village of Matteson contractor bond with annual renewal, consistent with the official PDF. Hours Mon–Fri 8:00 am–4:00 pm. Village code hosted on American Legal (codelibrary.amlegal.com/codes/matteson) but contractor section not located.
Track Matteson automatically
TownCert computes your Matteson renewal from the town's rule, keeps your bond and COI on file, and reminds you 60/30/14 days out — for every town you work in.
Start 14-day free trialAt a glance
- GC fee
- $150
- Sub fee
- $150
- Bond
- $10,000
- Expires
- Rolling (1 yr from issue)
- Submit via
- Online portal
Contact
- Department
- Community Development Department – Building Services Division
- Phone
- (708) 481-8313; permit technician Debbie Sobko 708-283-4930, dsobko@villageofmatteson.org
- Address
- 4900 Village Commons, Matteson, IL 60443
Sources
- www.villageofmatteson.org/departments/community_development/building_services.php
- www.villageofmatteson.org/departments/community_development/index.php
- cms7files.revize.com/mattesonil/Documents/Departments/Community%20Development/Building%20Services/ContractorsLicenseReqs_Updated5.28.26.pdf
- swiftbonds.com/surety-bond/village-of-matteson-il-contractor-bond/
Form / source date: Requirements PDF revised 5/28/2026